Most Phoenix pools need a refresh every 10–15 years. AE handles Pebble Tec resurfacing, waterline tile, coping, decking upgrades, and new water features. Snap a photo — full pool, no drain — and we'll show you the after.
Most remodel quotes are abstract — a tile sample on a sunlit table. With AE you see the actual finished pool, in your actual yard, before signing anything. Then we deliver exactly that.
Arizona ROC 340966 · 341002 · 347738 · 211530. Family-owned. Building Valley backyards since 2005.
Most Valley remodels run $18,000–$60,000+ depending on scope — resurfacing alone, full retile and coping, or a complete renovation with new decking and water features.
For resurfacing, yes — but only at the construction phase. Our design preview is generated from a photo of your current pool, full or empty. No drain needed to see the new look.
A standard resurface + tile is 2–4 weeks. Full renovation with new decking, coping, and water features runs 4–8 weeks.
Often, yes. We assess deck integrity during the consult and recommend resurface, recoat, or replacement based on condition and the new pool look.
Pebble Sheen and PebbleFina hold up best to AZ chemistry and heat. We help match finish color to your tile, coping, and decking.
Snap your tired pool. We'll render the after — no drain, no commitment.